It looks like we don't have the translated page you're looking for, but we do have other content in English and offer support in English.
The Work Progress chart shows a breakdown of tasks by status and user. By default, the chart shows the statistics for the top five users with the most active tasks in the folder, project, or space. For each user you can see how many tasks they have in the folder, project, or space that are:
Active
Completed
Overdue
Deferred
Canceled
The graph to the right of the user statistics shows how many tasks were in a particular status on a specific date. Hover over any part of the chart to see how many tasks were in each status on that particular day.
Under the names and profile images of the top five users is the option to Show all users. Click this option to see the task statistics for all users who have at least one task assigned to them in the folder, project, or space.
Click the slider icon at the bottom of the chart.
Drag the sliders left or right to adjust the time frame that the chart shows.
Click the three-dot menu button (located in the upper right-hand corner above the chart).
Select Edit from the drop-down list.
Click the drop-down arrow to the left of Include tasks. Here you'll see options to include tasks assigned to everyone or specific user(s), or created by anyone or specific user(s).
In the Show section use the checkboxes to the left of each status to either show or hide the data related to that status group.