Project Progress

Table 65. Availability

Free

Professional

Business

Enterprise


Overview

Project progress is available on Business accounts and up. All users, including collaborators, can see project progress. Regular users can enable or disable project progress on particular projects if they have full or editor access roles.

Wrike automatically calculates your project progress based on selected metrics and updates it in real time, allowing you to easily keep track of how a project is moving forward. You can see a project progress bar in:

  • The Android app: in the Browse view and Starred section.

  • The Wrike workspace (Wrike’s browser version and desktop app): in the project info panel, Table view, the project dashboard widget, project-based reports, and the timeline portion of the Gantt chart (to the right of the project’s name).

Learn how project progress is calculated here.

Enable project progress

There are two ways to enable project progress, either for individual projects manually or for all the projects in a space at the same time.

For a single project

  1. Navigate to the relevant project and open its project info panel.

  2. Click the project progress icon in the top-right corner 1.

  3. Select Completed tasks, Duration of completed tasks, or Tasks and duration average under Measure as 2.

  4. Your project progress is shown as a percentage in the icon.

project-progress-1.png

Open this panel and select Don't measure progress to stop measuring project progress.

For multiple projects

  1. Navigate to the space that you'd like to enable progress for all projects.

  2. Switch to Table view.

  3. Use the gear icon 1 in the top left-hand corner of the panel and turn on the Progress 2 field.

    project-progress-3.png
  4. Click the caret icon in the Progress 3 column title, and select Enable/Disable for all projects 4.

    project-progress-2.png